Interior Demolition Gut jobs & tear-outs
From a full gut to the studs to a single room tear-out, we take the inside down to the line you set, cap the utilities, and leave it clean for your trades.

Interior Demolition across Toronto & the GTA
Interior demolition is where most renovations start, and where most schedules slip. Waiting on a plumber to cap lines, a bin to arrive, or a crew to come back for day two adds up.
We bring the capping, the crew and the trailers on day one, so most interior demos are done in a single working day. Everything that stays is protected, and the space is left clean to the last screw.
What's included
- Full home guts to studs
- Kitchen, bathroom and basement tear-outs
- Non-load-bearing walls, drywall and framing
- Flooring down to subfloor or slab
- Ceilings, bulkheads and built-ins
- Plumbing and electrical capping in-house
How it works
- Site visitWe confirm the scope, permits and any asbestos checks.
- CappingOur team caps plumbing and electrical in the work area.
- Demo dayMost demolitions are done in one working day.
- Clean to the last screwDebris hauled, metal recycled, site swept, vacuumed and magnet-swept.
Free site visit & quote
Every demolition is quoted after a site visit or detailed photos, with a written scope before work starts. Got a written quote from someone else? We'll beat it.
Request a demo quoteInterior Demolition questions
How long does interior demolition take?
Most of our demolition projects are done in one working day. Full home guts can take longer, and we give you the schedule with your quote.
Can you remove a wall?
We remove non-load-bearing walls. Load-bearing walls need an engineer and a permit first.
Will there be dust through the house?
We seal off the work area and protect floors and doorways outside it.
