Trash Daddies
1-day demosPrices you won't beatClean to the last screw

Kitchen Demolition Tear-out ready for your new kitchen

Cabinets, countertops, backsplash, flooring and appliances out in one visit, with the plumbing and electrical capped by our own team.

The Trash Daddies crew logo

Kitchen Demolition across Toronto & the GTA

A kitchen renovation can't start until the old kitchen is gone, and that usually means coordinating a plumber, an electrician and a bin before the first cabinet comes off.

We do it as one job. Our team caps the sink and appliance lines, disconnects the circuits, removes everything down to the line you choose, and hauls it the same day. Cabinets in good condition can be removed carefully for donation or reuse.

What's included

  • Upper and lower cabinets
  • Countertops, including stone
  • Backsplash tile and drywall
  • Flooring down to subfloor
  • Sink, faucet and appliances
  • Plumbing and electrical capping

How it works

  1. Site visitWe confirm the scope, permits and any asbestos checks.
  2. CappingOur team caps plumbing and electrical in the work area.
  3. Demo dayMost demolitions are done in one working day.
  4. Clean to the last screwDebris hauled, metal recycled, site swept, vacuumed and magnet-swept.

Free site visit & quote

Every demolition is quoted after a site visit or detailed photos, with a written scope before work starts. Got a written quote from someone else? We'll beat it.

Request a demo quote

Kitchen Demolition questions

Can you save my cabinets?

Yes. Tell us before we start and we'll remove them carefully for donation, reuse or sale.

Do I need a plumber first?

No. We cap the sink and appliance lines ourselves.

How long does a kitchen tear-out take?

Most kitchen demolitions are done in one working day.

Book your demolition

437-288-5994Free quote
CallFree quote